This 30,000sf addition includes a new gymnasium and two-story classroom/office area. Structural materials include steel joists and deck bearing on masonry walls. This addition is seismically isolated from the existing building and utilizes a series of pedestrian “skywalks” to connect various parts of the building. Currently this project is under construction.